OEJN_DEL [GMP] Briefing Material | Hajj OPS: 2025
Covering
This section details all the necessary briefing materials for OEJN_DEL [GMP] during Hajj OPS: 2025
Designated Area of Responsibility
"Jeddah Clearance" (OEJN_DEL) will be responsible of issuing IFR clearances for all departure traffic from Jeddah and the transfer of traffic requesting push to the correct ground controller.
Notes
- IFR clearances in Jeddah include the departure runway, the SID, the initial climb, and the squawk using the prescribed phraseology in the SOP.
- The initial climb for all SIDs is 6000ft.
- Departure traffic at Apron A or C should expect RWY34R. Departure traffic at all other aprons should expect RWY34C.
- When traffic requests pushback, left click on AOBT.
- Departure traffic shall be handed off to "Jeddah Ramp" (OEJN_E_RMP) if at Apron 6, 7, A, B, C or to "Jeddah Ground" if at Apron 1, 2, 3, 4, 5, +-5 minutes from TSAT.
- Refer to ACDM guide for further notes.