Skip to main content

General Information

King Khalid International Airport (OERK) is a prominent airport serving Riyadh, the capital city of Saudi Arabia. Located approximately 35 kilometers north of Riyadh, it covers an area of around 225 square kilometers. Opened in 1983, it replaced the older Riyadh Airport and is named after King Khalid bin Abdulaziz Al Saud.

The airport is one of the busiest in the country and features a modern terminal complex with multiple passenger terminals. It serves as a vital hub for domestic and international flights, connecting Riyadh to various destinations around the world.

Aerodrome Details

Airport ICAOAirport NameAirport CoordinatesAirport RunwaysAirport Elevation
OERKKing Khalid International Airport24.9606°N, 46.6998°E15L/33R, 15R/33L1,773 feet AMSL

Runways

King Khalid International Airport (OERK) has 2 runways, 33L/15R and 33R/15L.

Runway Characteristics

RunwayDimensions (m)True BearingElevationSlope
15L4000 x 60150.001,7000.0%
33R4000 x 60330.001,7000.0%
15R3600 x 60150.001,7500.0%
33L3600 x 60330.001,7500.0%

Declared Distances

RunwayTORA (M)TODA (M)ASDA (M)LDA (M)
15L4000400040004000
33R4000400040004000
15R3600360036003600
33L3600360036003600

Air Traffic Services

King Khalid International Airport (OERK) is a fully controlled airport.

Airspaces

Airspace TypeAirspaceClassVertical LimitsController
Control ZoneRiyadh CTRCSFC - 4500ftAIR 1
Terminal Maneuvering AreaRiyadh TMA Part 1C700ft - FL195APP 1, FIN
Terminal Maneuvering AreaRiyadh TMA Part 2C2500ft - FL195APP 1
Control AreaRiyadh CTAAFL245 - FL600CTR 1, CTR 2

ATS Callsigns

Radio CallsignLogon CallsignAbbreviationFrequency (MHz)
Riyadh ATISOERK_ATISATIS127.150
Riyadh DeliveryOERK_DELGMP121.700
Riyadh GroundOERK_1_GNDSMC 1121.600
Riyadh TowerOERK_1_TWRAIR 1118.600
Riyadh TowerOERK_1_TWRAIR 2118.800
Riyadh ApproachOERK_APPAPP 1120.000
Riyadh Final ApproachOERK_F_APPFIN119.750
Riyadh Terminal ControlOERK_1_CTRCTR 1124.100
Riyadh Terminal ControlOERK_2_CTRCTR 2126.000

SOP Ammendment Record

SOP TypeRevisionChangesPrepared ByRevised and Approved By
Delivery [DEL]01/2025Initial ReleaseIsmail Hassan - ACCSA1Ismail Hassan - ACCSA1
Ground [GND]01/2025Initial ReleaseIsmail Hassan - ACCSA1Ismail Hassan - ACCSA1
Tower [TWR]----Ismail Hassan - ACCSA1--
Approach [APP]--------