OERK_DEL [GMP] Briefing Material | Cross the Land: Westbound 2026
Covering
This section details all the necessary briefing materials for OERK_DEL [GMP] during Cross the Land: Westbound 2026
Designated Area of Responsibility
"King Khalid Clearance" (OERK_DEL) will be responsible of issuing IFR clearances for all departure traffic from Riyadh and the transfer of traffic requesting push to the correct ground controller.
General Notes
- Expect the IFR flight plans to be validated and corrected by "King Khalid Planner" (OERK_P_DEL) preemptively.
- IFR clearances in Riyadh include the departure runway, the SID, the initial climb, and the squawk using the prescribed phraseology in the SOP.
- The initial climb for all SIDs is 8000ft.
- Departure traffic shall only be cleared on RWY 33R/15L regardless of their stand or requests as SARO will be in use during the whole event to maximize the departure runway capacity.
- Departure traffic shall be handed off to "King Khalid Ground" (OERK_N_GND) if at Apron 1, 2, 3, 4, 5 or to "King Khalid Ground" (OERK_S_GND) controller if at Apron 6, 7, 8, 9.
Flow Management
- IFR Clearance must include a startup time after recieving a correct readback from the pilot.
- When TSAT turns Green and (+5 / -5) window is met, the traffic should be transferred to the correct ground controller for pushaback.
Pilot: SVA1024, ready for startup
GMP: SVA1024, For startup contact ground on 121.600
Aircraft calls for startup and his TSAT is light green:
Pilot: SVA1042, ready for startup
GMP: SVA1042, TSAT 1540
or
GMP: SVA1042, expect startup at 1540